Servers, Storage & Data Centre Setup

Servers and storage we size, supply, build and support

Kirti Telnet designs, supplies, installs and supports servers, storage and virtualisation for enterprise, government and defence clients. 30 years of building these systems, and one team from the first survey to AMC.

Get a quote
Team100+ engineersPlanningSized to your workloadSupportComprehensive or non-comprehensive AMCProcurementGeM registered seller
Three copies, two media, one off-siteCOMPUTESTORAGEPROTECTIONServersvirtual machinesStorageRAIDBackup+ DR sitePrimary dataprotected by RAIDSecond and third copyother media, other site3 copiesBackup on separate media, DR copy off-siteThe 3-2-1 rule: 3 copies, 2 media, 1 off-site
How Kirti Telnet can help

Five stages, one team, from survey to handover.

One Kirti Telnet team. Each stage ends with a document you can file.

1 · PlanWe plan it
2 · SupplyWe supply it
3 · InstallWe build it
4 · Hand overWe hand it over
What we do

  • Collect applications, users, data size and growth plans
  • Measure the load on today’s servers at the busiest hour
  • Survey the room: space, power, cooling, racks
What you receive

Survey report and inventory of what you run

What we need from you

  • Applications and user list
  • Site access
How Kirti plans

Six questions we settle before any hardware is ordered.

Servers and storage are used for five years or more, so most costly mistakes are made at sizing. These are the questions we settle with you first.

Question 1 of 6

Workloads and users

What we ask you

  • Which applications will run on it, and how many people use them?
  • Which are critical, and which are only for testing?
  • Which need fast single-thread speed, and which need many cores?
What it decides

  • The number and size of servers
  • Core count against clock speed
  • Whether to run on virtual machines
The mistake we see most

Sizing to the application vendor’s minimum instead of your busiest day.

Server types

Six server types we supply, and when each is the right call.

What we specify for each, and what we have seen go wrong.

Type 1 of 6

Rack server (1U, 2U and larger)

Best for

  • Virtualisation hosts, databases and business applications
  • VDI, and nodes for software-defined storage
What we specify

  • One socket or two. Single-socket servers now reach high core counts and many PCIe lanes, and a single socket often lowers the licence bill
  • 1U for density. 2U for more drive bays, more PCIe slots and cooler running
  • Four-socket servers only for very large in-memory databases
  • Memory in every channel, evenly filled
Watch for

More processor cores than the workload and the licences need.

Architectures

Three architectures we design. The choice sets how it scales and where it can fail.

We recommend on your workload, not on a brand, and often use a mix of the three.

Compare Traditional 3-tier Hyper-converged (HCI) AI and GPU supernodes
Building blocks Rack servers, a SAN or NAS array, and switches. Fibre Channel or iSCSI between servers and storage Servers with local drives, pooled by software such as Nutanix, VMware vSAN or Proxmox with Ceph. Ethernet only 4-GPU or 8-GPU servers, a fast network fabric, and flash or parallel file storage
Best for Large estates, mission-critical databases, and teams that run compute and storage separately Mid-size estates, VDI, branch sites, and teams that want one console AI training and inference, simulation and rendering
Availability comes from Dual controllers, two fabrics (A and B) and clustered hosts Copies or erasure coding across three or more nodes Redundant power supplies, spare nodes and checkpointed jobs
Watch for One array or one fabric left as a single point of failure Adding nodes for storage and then licensing the cores that come with them GPUs ordered before the rack can power and cool them

See also Storage types, Hyper-Converged Infrastructure and Enterprise GPU Servers.

Our standard checklist

Eight things we decide on every server: processors, graphics cards, memory, drives and the rest.

This is the checklist behind every bill of quantities Kirti Telnet writes. Figures come from the manufacturers’ published information. We confirm exact models, availability and OEM support at quotation, because this market moves quickly.

Platform Cores Memory I/O Where we use it
AMD EPYC 9005 (Zen 5) Up to 128 performance cores, or up to 192 dense Zen 5c cores, per socket 12 channels of DDR5 up to 6400 MT/s, up to 6 TB per socket 128 PCIe 5.0 lanes, 160 in a dual-socket server. CXL 2.0 Virtualisation and VDI density, HPC, in-memory analytics, GPU hosts that need many PCIe lanes. High-frequency models suit per-core licensed databases
Intel Xeon 6 P-core (6900P and 6700P) 6900P: up to 128 performance cores per socket. 6700P: up to 86 6900P: 12 channels of DDR5-6400, or MRDIMM up to 8800 MT/s. 6700P: 8 channels of DDR5-6400 6900P: up to 96 PCIe 5.0 lanes per socket, 192 in two sockets. 6700P: up to 88. CXL 2.0 Databases, analytics and CPU-side AI inference using the AMX matrix engine, and workloads bound by memory bandwidth
Intel Xeon 6 E-core (6700E and 6900E) Up to 144 and up to 288 efficiency cores DDR5 PCIe 5.0 Web tiers, microservices, containers and scale-out services where cores per watt matter more than single-thread speed

Licence before cores

If the software is licensed per core, fewer and faster cores often cost less than the densest processor.

Count the PCIe lanes

Each GPU takes 16 lanes, each NVMe drive 4, each fast network card 8 or 16. Add them up before choosing the socket count.

Fill every channel

Twelve channels per socket means 12 or 24 DIMMs. Unbalanced memory loses bandwidth and costs performance.

Budget the watts

Top processors are rated at about 400 to 500 W each. Check the rack power and cooling before the order.

Next-generation platforms from both vendors have been announced for 2026 and 2027. We confirm release dates and OEM support before we quote them.

Storage types

Six storage classes we deploy. We match the class to the data, not to the budget alone.

Where each fits, how it works and what we check. Our sizing calculators are below.

Class 1 of 6

Entry SAN and DAS

Best for

  • Small virtualisation clusters of two to four hosts
  • Shared block storage without a large budget
How it works

  • Two controllers share the drives, so one can fail without stopping access
  • Hosts connect over 12G SAS directly, or over iSCSI or Fibre Channel
  • Expansion shelves add capacity
What we check

  • Dual controllers and host ports that match your servers
  • Mix of SSD and hard disk, and which snapshot or replication features need a licence
Watch for

Block-only arrays bought for a job that also needs file shares.

Our sizing method

Usable storage

8

8 TB

RAID level

Hot spare drive

We would plan

48 TB usable

Capacities are in decimal TB, as drives are sold. The operating system shows about 9% less, in TiB. Keep pools below about 80% full.

Storage protocols reference: iSCSI, Fibre Channel, NVMe over fabrics, SAS, NFS, SMB and S3
Protocol Type Typical use What to know
iSCSI Block over Ethernet VM datastores, databases Use dedicated 10 or 25 GbE ports and multipath I/O.
Fibre Channel Block over a dedicated fabric Mission-critical, low latency Needs FC adapters and switches, at 16G or 32G.
NVMe over fabrics Block over Ethernet, FC or RDMA All-flash, latency-sensitive Needs support in the array, the network and the hosts.
SAS direct Block, direct-attached Two to four hosts No switch needed, but cables are short and hosts are few.
NFS File Linux shares, VM datastores Simple to run. Performance depends on the network design.
SMB File Windows shares, Hyper-V storage SMB 3 adds multichannel and continuous availability.
S3 Object Backup repositories, archives, analytics Object lock gives copies that cannot be deleted.
Virtualisation

We deploy VMware, Hyper-V, Proxmox and Nutanix, and we cost all four before you commit.

The hypervisor decides your software cost, your backup options and the skills your team needs. We size the hardware for whichever you choose.

Platform 1 of 4

VMware vSphere

What it is

  • ESXi bare-metal hypervisor, managed by vCenter
  • vMotion live migration, DRS load balancing and HA restart
  • Datastores on SAN, NFS or vSAN, which pools local drives
Licensing

  • Per-core subscription. At least 16 cores are counted for every processor
  • Minimum order sizes have applied since 2025, and perpetual licences are no longer sold
Indicative cost

  • About USD 135 per core per year list for vSphere Foundation, and about USD 350 for Cloud Foundation
  • A two-socket host of 32 cores: about USD 4,320 a year on vSphere Foundation
  • Broadcom publishes no public rate card, so quotes differ
Choose when

You run a large estate, or depend on tools and skills built around VMware. For a small site, we confirm current terms before recommending it.

All prices are approximate and can change at any time. Cost figures are public list prices in US dollars and euros, from late 2026, before tax, and exclude hardware, support and backup software. Indian prices depend on the channel, the agreement and the exchange rate. We quote in rupees, with the licence cost shown for each option.

Data centre setup

We build the room too: rack, power paths and cooling.

Kirti Telnet follows the same discover, design and build stages shown above, and joins the cabling, power and cooling to the build. See Structured Cabling.

Step What it gives What it needs Typical recovery point Typical recovery time
Backup to separate media Recovery from deletion, ransomware or loss of the data Backup software, a repository and an immutable copy The last backup, often hours to a day Hours to days, by data size
Asynchronous replication A copy at a second site, a short delay behind A second site and a link sized to the change rate Minutes behind, by schedule and link Minutes to an hour, with a restart at the second site
Synchronous replication A second copy written before the write is acknowledged A low-latency link, and storage or software that supports it Zero or close to it Minutes, with automated failover
Multi-site cluster Both sites run workloads and each can carry the other A low-latency link, a witness at a third location, and capacity for both sites Zero Virtual machines restart on the other site automatically

Recovery point

How much recent data you can afford to lose. It decides between asynchronous and synchronous copies.

Recovery time

How long you can be down. It decides between a manual restart and automated failover.

Rehearse it

A failover that has never been tested is a guess. We test a failover and a restore at handover.

Tools by platform: vSphere HA and vSAN stretched clusters, Hyper-V Replica and failover clustering, Proxmox storage replication on ZFS, Nutanix asynchronous, NearSync and metro replication, and array replication on SAN and NAS. Figures depend on the design and the link, and we confirm each feature against the vendor’s current documentation at design.

What we design to

Inlet temperature

ASHRAE recommends 18 to 27 °C for the air entering the servers. We plan cooling to hold that range.

Data centre category

We agree the tier you need, using the Uptime Institute and TIA-942 tier ideas, before sizing.

Redundancy

N, N+1 or 2N for power and cooling, agreed in the first phase so the budget matches the risk.

Cutting over live workloads

Moving ERP and databases onto new hardware, without losing a day of production.

Before the window

We take a full backup and a bootable image of every machine in scope, export the host and storage configuration, and record the current IOPS and memory ceiling, so we can show you afterwards that the new platform is faster and not merely newer.

The window itself

Migration runs in a window you set, usually a weekend or a planned shutdown. We move one workload group at a time: test and development first, then file and print, then ERP and database last.

The way back

The old hosts stay powered, licensed and cabled with their storage intact until you sign off. The rollback trigger is agreed in writing: if a workload misses its checkpoint, it goes back to the old host inside the same window.

Who owns it on Monday

Your administrators hold the hypervisor and storage credentials, the as built diagram, the RAID and firmware baseline, and a named KTPL engineer under AMC. Spare drives and a replacement controller are agreed as part of the handover.

No migration is risk free. What we commit to is a rehearsed sequence, a restore tested before we start, and a way back we have actually used.

Brands and platforms

Brands and platforms in our solutions.

Shown for reference. We propose what fits your requirement and share OEM authorisation where it applies.

DellHPELenovoSupermicroTyroneNetAppQNAPQSANVMwareMicrosoft Hyper-VProxmox VENutanix
Add to your enquiry

Your enquiry: Servers, Storage and Data Centre + Data backup and disaster recovery

Quote these together on WhatsApp

Engineers’ questions

Questions IT heads ask us about servers, storage, GPUs and virtualisation.

VMware, Hyper-V, Proxmox or Nutanix: which should I use?

It depends on the licences you already own, the skills of your team, the backup tools you use and the budget. Hyper-V suits Windows-heavy estates. VMware suits large estates built around its tools, but is now a per-core subscription. Proxmox removes the licence fee and suits Linux-skilled teams. Nutanix suits hyper-converged designs with one console. We price each option for your workload before you choose.

How is Windows Server licensed on a new server?

By physical core. You license every core in the server, with a minimum of 8 core licences per processor and 16 per server, plus client access licences for users or devices. Standard edition covers two virtual machines on the host and Datacenter edition covers unlimited. Storage Spaces Direct needs Datacenter. In a cluster, every host must be licensed for the virtual machines that can run on it.

Which processor suits software that is licensed per core?

Usually a processor with fewer cores at a higher clock speed. Every core costs licence money, so a 192-core processor can be the expensive choice for a database or a virtualisation host that only needs 32 fast cores. We work out the licence cost for each candidate processor before we choose.

How much GPU memory does an AI model need?

As a first estimate, parameters multiplied by bytes per parameter: 2 bytes at FP16, 1 at FP8, 0.5 at FP4. A 70 billion parameter model at FP16 needs about 140 GB for weights alone. Add 20 to 30 percent for the key-value cache and activations, and more for long contexts or many simultaneous users. Training needs several times more memory than inference.

RAID 5 or RAID 6: which should I choose?

With large drives or wide arrays, RAID 6. A RAID 5 rebuild reads every other drive while no protection is left, so a second failure or a read error during it can lose data. RAID 5 can be fine for small arrays of smaller drives. RAID 10 suits databases and virtual machines that write a lot, at the cost of half the raw capacity. In every case RAID is not a backup.

What warranty and AMC do you give?

Every product we supply carries the manufacturer’s (OEM) warranty, and we can arrange extended warranty beyond it. For support afterwards we offer AMC in two forms: comprehensive, which includes spares and replacement, and non-comprehensive, which covers service and labour.

Start here

Send the requirement. We will find the route.

Share the number of users, the applications and the data you hold. You get a priced design, or a site visit first if the numbers need checking.

Get in Touch Today for Expert Solutions and Support