Servers, Storage & Data Centre Setup
Servers and storage we size, supply, build and support
Kirti Telnet designs, supplies, installs and supports servers, storage and virtualisation for enterprise, government and defence clients. 30 years of building these systems, and one team from the first survey to AMC.
Five stages, one team, from survey to handover.
One Kirti Telnet team. Each stage ends with a document you can file.
- Collect applications, users, data size and growth plans
- Measure the load on today’s servers at the busiest hour
- Survey the room: space, power, cooling, racks
Survey report and inventory of what you run
- Applications and user list
- Site access
- Size servers, storage and network with room to grow
- Choose hypervisor, storage class, RAID level and backup approach
- Cost the licences, power and cooling for each option
Design, sizing, BOM and rack layout
- Sign-off on uptime and recovery targets
- Item-by-item BOQ, with options by platform and warranty and licences included
- GeM or tender-ready compliance
BOQ, quote and OEM authorisation
- Choice of option, then a PO or GeM order
- Install racks, servers and storage
- Update firmware, then configure RAID, hypervisor, network and remote management
Configuration record of every system
- Site access, with power and network points ready
- Test a power, drive, link or host failure, and a live migration
- Restore a backup to prove it works
- Register the warranty and start AMC if you choose it
Handover pack: documents, warranties, test results
- Handover sign-off
Six questions we settle before any hardware is ordered.
Servers and storage are used for five years or more, so most costly mistakes are made at sizing. These are the questions we settle with you first.
Workloads and users
- Which applications will run on it, and how many people use them?
- Which are critical, and which are only for testing?
- Which need fast single-thread speed, and which need many cores?
- The number and size of servers
- Core count against clock speed
- Whether to run on virtual machines
Sizing to the application vendor’s minimum instead of your busiest day.
Data and growth
- How much data do you hold today, and how fast does it grow?
- How long must it be kept?
- How much of it is hot, and how much is cold?
- Raw and usable capacity
- RAID level, drive type and the class of storage
- What goes on flash and what goes on disk
Sizing for today’s data and forgetting snapshots and backup copies.
Uptime and recovery
- How long can each system be down? This is the recovery time.
- How much recent data can you afford to lose? This is the recovery point.
- Redundant power supplies, clustering or hyper-converged nodes
- Replication method and the backup and disaster recovery approach
Treating RAID as a backup. RAID survives a failed drive, not a deleted file or ransomware.
Virtualisation and licences
- Windows, Linux or both?
- Which hypervisor do you run now, and which licences do you own?
- What backup tool and what skills does your team have?
- VMware, Hyper-V, Proxmox or Nutanix, and the cost of each
- Core count per server, and the number of hosts
- Windows Server is licensed per physical core: at least 8 per processor and 16 per server, plus access licences
Buying a high-core processor for a light workload, then paying to license every core.
Room, power and cooling
- Where will the equipment sit?
- What power and cooling does that room already have?
- UPS size and cooling capacity
- Rack count and layout
Adding servers to a room whose UPS and cooling were sized for fewer.
Support and refresh
- How long will you keep this equipment?
- Who looks after it day to day?
- Warranty length and extended cover
- Comprehensive or non-comprehensive AMC, and spares
Warranty ending with no plan for support or refresh.
Six server types we supply, and when each is the right call.
What we specify for each, and what we have seen go wrong.
Rack server (1U, 2U and larger)
- Virtualisation hosts, databases and business applications
- VDI, and nodes for software-defined storage
- One socket or two. Single-socket servers now reach high core counts and many PCIe lanes, and a single socket often lowers the licence bill
- 1U for density. 2U for more drive bays, more PCIe slots and cooler running
- Four-socket servers only for very large in-memory databases
- Memory in every channel, evenly filled
More processor cores than the workload and the licences need.
Tower server
- Small offices, branches and remote offices
- File, print, small databases and one or two virtual machines
- A single processor in most cases, with room to add drives and memory
- Redundant power supplies and a remote management controller, which not every tower has
- Noise and ventilation for the place it will stand
- A rack conversion path, if you may move to a rack later
A tower that has outgrown its corner in two years, with no path to a rack.
Edge and rugged server
- Factories, retail stores, telecom sites and defence locations
- Machine vision, video surveillance, point of sale and local VDI
- Short-depth chassis for small cabinets. Edge servers are built for heat, dust, shock and vibration
- Operating temperature range and air filtering for the site
- Remote management that works over a slow or unreliable link
- Whether the site needs its own local storage and backup
Putting a data-room server in a dusty cabinet on a factory floor.
GPU and AI server
- AI training and inferencing, rendering, simulation and digital twins
- See Enterprise GPU Servers for the full range, and the specification section below
- 2U servers hold a few PCIe GPUs. Larger 4U to 6U systems hold eight GPUs on a high-speed GPU interconnect
- GPU memory against the size of the model
- Power per server, from a few kW to well over 10 kW for eight-GPU systems, and air or direct liquid cooling
- Network between servers for multi-node training
Buying GPUs before the rack has the power and cooling to run them.
Blade and multi-node
- Larger server rooms where rack space, power and cabling are the limit
- Many identical nodes, such as VDI or private cloud
- Chassis power and cooling, which have to be there before the first blade
- Network and storage connections shared by the whole chassis
- How many nodes you will really fill
Buying a large chassis for a dozen nodes you may never need.
Hyper-converged node
- Many virtual machines on shared hardware
- Teams that want to grow by adding nodes
- See Hyper-Converged Infrastructure
- Node count for the availability you need, usually three or more
- 25 GbE or faster between nodes, with redundant switches
- Drives that match the storage software, flash for cache and capacity
- Hypervisor and storage licence cost per node
Choosing HCI for two or three small workloads that one server and a backup would carry.
Three architectures we design. The choice sets how it scales and where it can fail.
We recommend on your workload, not on a brand, and often use a mix of the three.
| Compare | Traditional 3-tier | Hyper-converged (HCI) | AI and GPU supernodes |
|---|---|---|---|
| Building blocks | Rack servers, a SAN or NAS array, and switches. Fibre Channel or iSCSI between servers and storage | Servers with local drives, pooled by software such as Nutanix, VMware vSAN or Proxmox with Ceph. Ethernet only | 4-GPU or 8-GPU servers, a fast network fabric, and flash or parallel file storage |
| Best for | Large estates, mission-critical databases, and teams that run compute and storage separately | Mid-size estates, VDI, branch sites, and teams that want one console | AI training and inference, simulation and rendering |
| Availability comes from | Dual controllers, two fabrics (A and B) and clustered hosts | Copies or erasure coding across three or more nodes | Redundant power supplies, spare nodes and checkpointed jobs |
| Watch for | One array or one fabric left as a single point of failure | Adding nodes for storage and then licensing the cores that come with them | GPUs ordered before the rack can power and cool them |
See also Storage types, Hyper-Converged Infrastructure and Enterprise GPU Servers.
Eight things we decide on every server: processors, graphics cards, memory, drives and the rest.
This is the checklist behind every bill of quantities Kirti Telnet writes. Figures come from the manufacturers’ published information. We confirm exact models, availability and OEM support at quotation, because this market moves quickly.
| Platform | Cores | Memory | I/O | Where we use it |
|---|---|---|---|---|
| AMD EPYC 9005 (Zen 5) | Up to 128 performance cores, or up to 192 dense Zen 5c cores, per socket | 12 channels of DDR5 up to 6400 MT/s, up to 6 TB per socket | 128 PCIe 5.0 lanes, 160 in a dual-socket server. CXL 2.0 | Virtualisation and VDI density, HPC, in-memory analytics, GPU hosts that need many PCIe lanes. High-frequency models suit per-core licensed databases |
| Intel Xeon 6 P-core (6900P and 6700P) | 6900P: up to 128 performance cores per socket. 6700P: up to 86 | 6900P: 12 channels of DDR5-6400, or MRDIMM up to 8800 MT/s. 6700P: 8 channels of DDR5-6400 | 6900P: up to 96 PCIe 5.0 lanes per socket, 192 in two sockets. 6700P: up to 88. CXL 2.0 | Databases, analytics and CPU-side AI inference using the AMX matrix engine, and workloads bound by memory bandwidth |
| Intel Xeon 6 E-core (6700E and 6900E) | Up to 144 and up to 288 efficiency cores | DDR5 | PCIe 5.0 | Web tiers, microservices, containers and scale-out services where cores per watt matter more than single-thread speed |
Licence before cores
If the software is licensed per core, fewer and faster cores often cost less than the densest processor.
Count the PCIe lanes
Each GPU takes 16 lanes, each NVMe drive 4, each fast network card 8 or 16. Add them up before choosing the socket count.
Fill every channel
Twelve channels per socket means 12 or 24 DIMMs. Unbalanced memory loses bandwidth and costs performance.
Budget the watts
Top processors are rated at about 400 to 500 W each. Check the rack power and cooling before the order.
Next-generation platforms from both vendors have been announced for 2026 and 2027. We confirm release dates and OEM support before we quote them.
| Accelerator | Memory | Power and cooling | Built for |
|---|---|---|---|
| NVIDIA RTX PRO 6000 Blackwell Server Edition | 96 GB GDDR7, about 1.6 TB/s | Up to 600 W, configurable. Passive PCIe card for air-cooled servers. Up to 4 MIG partitions | Enterprise AI inference and RAG, virtual GPU desktops for CAD and design, rendering, video, digital twins and simulation |
| NVIDIA H200 | 141 GB HBM3e | Up to 700 W in the SXM form. A PCIe NVL version exists for standard servers | Large-model inference, fine-tuning and memory-bound HPC |
| NVIDIA HGX B200 | 180 GB HBM3e per GPU. NVIDIA lists 1.4 TB across the eight GPUs on one baseboard | NVLink and NVSwitch at 1.8 TB/s per GPU, 14.4 TB/s in total. Up to about 1,000 W per GPU, so air or liquid cooling depends on the server design | Training and large-scale inference. The baseboard inside OEM 8-GPU servers and the DGX B200 |
| NVIDIA HGX B300 | 288 GB HBM3e per GPU. NVIDIA lists 2.1 TB of fast memory across the eight GPUs on one baseboard | NVLink and NVSwitch at 1.8 TB/s per GPU, 14.4 TB/s in total. Reported up to 1,100 to 1,400 W per GPU by configuration, so liquid cooling is usual | Reasoning models, long-context inference and large-scale training. The baseboard inside OEM 8-GPU servers and the DGX B300 |
| AMD Instinct MI350X and MI355X | 288 GB HBM3E, 8 TB/s | OAM modules of roughly 1,000 to 1,400 W by model. Eight per node, in air-cooled or liquid-cooled racks | Large-model training and inference, FP64 HPC, on the ROCm software stack |
Eight Blackwell GPUs in one 10U system
- 1,440 GB of GPU memory in total, with 14.4 TB/s of NVLink bandwidth between the GPUs
- Two Intel Xeon Platinum 8570 processors (112 cores) and 2 TB of system memory, expandable to 4 TB
- Eight ConnectX-7 ports for up to 400 Gb/s InfiniBand or Ethernet, and eight 3.84 TB NVMe drives
- About 14.3 kW at maximum draw. Built for large language models, recommender systems and as the building block of DGX BasePOD and SuperPOD
Blackwell Ultra: more memory, faster network
- Eight Blackwell Ultra GPUs with 2.1 TB of GPU memory and 14.4 TB/s of NVLink bandwidth
- Intel Xeon 6776P processors, with eight ConnectX-8 ports for up to 800 Gb/s, and eight 3.84 TB E1.S NVMe drives
- About 14 kW, 10U, in NVIDIA MGX racks or traditional enterprise racks. NVIDIA states 1.5 times the dense FP4 compute of the B200 system
- Aimed at large-model inference and training, and AI factories for reasoning workloads
Either system draws about 14 kW, so we design the rack power, three-phase supply and cooling before the order, not after it. Both ship with NVIDIA DGX OS. Support terms depend on the package we quote. Figures are NVIDIA’s published ones.
Inference
Limited by GPU memory capacity and bandwidth. PCIe cards in standard servers are often enough, and cost the least to power and cool.
Training
Limited by GPU-to-GPU bandwidth and the network between servers. Needs NVLink or OAM nodes and 400 Gb fabrics, plus serious power and cooling.
Graphics and VDI
Limited by frame buffer per user and vGPU licensing. We size users per GPU from the applications they run.
| Precision | Bytes per parameter | 8B model | 70B model | 405B model |
|---|---|---|---|---|
| FP16 or BF16 | 2 | 16 GB | 140 GB | 810 GB |
| FP8 | 1 | 8 GB | 70 GB | 405 GB |
| FP4 | 0.5 | 4 GB | 35 GB | about 203 GB |
Add 20 to 30 percent for the key-value cache and activations, and more for long contexts or many users. A 70B model at FP16 needs about 140 GB for weights alone, so it spans two 96 GB cards or fits one 180 GB-class GPU. At FP8 it fits one 96 GB card, but with little room for context.
| Memory type | Speed and size | Where it is used | What to know |
|---|---|---|---|
| DDR5 RDIMM (ECC) | 4800 to 6400 MT/s. Modules from 16 GB to 256 GB | All current servers: virtualisation, databases, VDI | Always ECC in servers. Twelve channels per socket on the current EPYC and Xeon 6 platforms |
| DDR5 MRDIMM | Up to 8800 MT/s on Xeon 6 | Memory-bandwidth-bound work: analytics, HPC, in-memory databases | Needs a platform and BIOS that support it. Costs more per GB |
| CXL memory expansion | CXL 2.0 on both server platforms | Very large memory pools beyond the DIMM slots | Slower than local DIMMs. A planning option, not yet routine for most estates |
| GPU memory: GDDR7 | 96 GB on the RTX PRO 6000, about 1.6 TB/s | Inference, graphics, virtual desktops | Capacity decides which models and how many users fit |
| GPU memory: HBM3e | 141 GB to 288 GB per GPU, up to 8 TB/s | Training and large-model inference | Soldered to the accelerator. You cannot upgrade it later |
Fill the channels
A dual-socket server with 12 channels per socket has 24 channels. 24 modules of 64 GB give 1.5 TB at full bandwidth.
One DIMM per channel
Two modules on a channel often lowers the memory speed. For top speed, use fewer, larger modules.
Plan memory first
Virtualisation hosts usually run out of memory before processor. We size memory from the virtual machines, then pick the cores.
Leave slots free
Choose a module size that leaves empty slots for growth, instead of filling every slot with small modules.
| Drive type | Interface and speed | Typical capacity | Where we use it |
|---|---|---|---|
| NVMe SSD (U.2, U.3, E1.S, E3.S) | PCIe 4.0 or 5.0 x4. Gen 5 reads reach about 14 GB/s per drive | 1.92 TB to 60 TB class | Databases, VDI, AI data, all-flash arrays, ZFS and Ceph pools |
| SAS SSD | 12G or 24G SAS, dual-ported | 0.96 TB to 30 TB class | Shared storage arrays, where two controllers reach the same drive |
| SATA SSD | 6 Gb/s | 0.48 TB to 7.68 TB | Boot drives, read-heavy servers, entry systems |
| Nearline hard disk (7.2K rpm, SAS or SATA) | 12G SAS or 6 Gb/s SATA | Up to about 30 TB class | Backup targets, archives, surveillance, the capacity tier |
| M.2 boot module | PCIe NVMe, often mirrored in hardware | 240 GB to 960 GB | Hypervisor or operating system, kept apart from data |
Endurance (DWPD)
Read-intensive drives are about 1 full write a day, mixed-use about 3. Pick by how much you write, not by price.
Dual-port for shared storage
SAS drives have two ports, so either controller can reach them. SATA and most NVMe drives do not.
Form factor
E1.S and E3.S pack more drives per chassis and cool better than 2.5-inch drives, but need a server built for them.
Big disks rebuild slowly
A 24 TB hard disk can take days to rebuild. That is why we choose RAID 6 or erasure coding for large drives.
| Item | What we decide | Why it matters |
|---|---|---|
| Storage controller | Hardware RAID card, or an HBA with software RAID | RAID cards suit local RAID. HBAs suit ZFS, Ceph and other storage software that manages the drives itself. |
| Network | 1, 10, 25 or 100 GbE. Number of ports. Fibre Channel if needed | Storage traffic and live migration need their own bandwidth, apart from user traffic. |
| Power supplies | Redundant and hot-swap, sized for the full configuration | One supply failing must not stop the server, so each supply must be able to carry the whole load. |
| Remote management | Out-of-band controller, alerts, virtual console | Lets us fix, update and reinstall without a site visit. |
| Firmware and drivers | One tested set for the server, RAID card, network card and drives | Mismatched firmware is a common cause of dropped drives and storage faults. |
These sit beside the processor, memory and drives on every bill of quantities. A server is only as available as its weakest single part.
Six storage classes we deploy. We match the class to the data, not to the budget alone.
Where each fits, how it works and what we check. Our sizing calculators are below.
Entry SAN and DAS
- Small virtualisation clusters of two to four hosts
- Shared block storage without a large budget
- Two controllers share the drives, so one can fail without stopping access
- Hosts connect over 12G SAS directly, or over iSCSI or Fibre Channel
- Expansion shelves add capacity
- Dual controllers and host ports that match your servers
- Mix of SSD and hard disk, and which snapshot or replication features need a licence
Block-only arrays bought for a job that also needs file shares.
Unified NAS and SAN
- File shares and virtual machine storage on one system
- Mid-size sites that want one platform to manage
- One pool serves files over NFS and SMB and blocks over iSCSI or Fibre Channel
- Snapshots, thin provisioning, compression and deduplication
- Replication to a second system for disaster recovery
- What data-reduction ratio a quote assumes, and under which conditions
- Replication method, ransomware protection and how the system grows
Sizing capacity on a reduction ratio your data will not reach.
All-flash NVMe
- Databases, VDI and applications that need low latency
- NVMe drives deliver sub-millisecond latency and very high IOPS
- NVMe over fabrics carries NVMe commands over Ethernet or Fibre Channel to the hosts
- The IOPS and latency you need, measured on your busiest hour
- Network: 25 or 100 GbE, or 32G Fibre Channel
- Capacity left after RAID, spares and reserved space
Putting cold archive data on the most expensive tier.
Scale-out file and object
- Media, surveillance, analytics and AI data
- Storage that grows to petabytes
- Nodes are added to grow both capacity and throughput
- Data is protected by erasure coding across nodes, not by RAID inside one box
- Access over NFS, SMB or S3
- Growth in petabytes, and the access protocol
- Throughput, not only capacity
- What a node failure costs in capacity and rebuild time
Sizing for capacity when throughput is what limits the workload.
ZFS-based storage
- Virtual machine storage and file shares at a modest budget
- Backup targets that must detect silent corruption
- ZFS checksums every block and repairs bad ones from redundancy
- RAIDZ levels, near-instant snapshots and replication between systems
- Runs on ECC memory, and adds flash for caching
- ECC memory size, because ZFS uses memory as cache
- Which hypervisors the system is validated for
- Who supports the system and how fast
Filling the pool. ZFS slows sharply when it is nearly full.
Backup target and archive
- Holding the second copy of your data
- Long-term retention and ransomware recovery
- Disk targets with deduplication keep many restore points in little space
- Immutable copies, through object lock or locked snapshots, cannot be deleted by an attacker
- Tape or a cloud copy gives the off-site leg of the 3-2-1 rule
- Daily change rate and retention, which decide the capacity
- Restore speed for your largest system
- See Data Backup and Disaster Recovery
Backups on the same array as the data they protect.
Usable storage
Capacities are in decimal TB, as drives are sold. The operating system shows about 9% less, in TiB. Keep pools below about 80% full.
Servers and storage
Assumptions: 25% memory headroom, 20% extra for snapshots and replicas, storage pools kept under 80% full, three years of growth, RAID 6 on 8 TB drives with one hot spare. An illustration, not a quotation. Databases are also sized on IOPS, and AI workloads on GPU memory.
Storage protocols reference: iSCSI, Fibre Channel, NVMe over fabrics, SAS, NFS, SMB and S3
| Protocol | Type | Typical use | What to know |
|---|---|---|---|
| iSCSI | Block over Ethernet | VM datastores, databases | Use dedicated 10 or 25 GbE ports and multipath I/O. |
| Fibre Channel | Block over a dedicated fabric | Mission-critical, low latency | Needs FC adapters and switches, at 16G or 32G. |
| NVMe over fabrics | Block over Ethernet, FC or RDMA | All-flash, latency-sensitive | Needs support in the array, the network and the hosts. |
| SAS direct | Block, direct-attached | Two to four hosts | No switch needed, but cables are short and hosts are few. |
| NFS | File | Linux shares, VM datastores | Simple to run. Performance depends on the network design. |
| SMB | File | Windows shares, Hyper-V storage | SMB 3 adds multichannel and continuous availability. |
| S3 | Object | Backup repositories, archives, analytics | Object lock gives copies that cannot be deleted. |
We deploy VMware, Hyper-V, Proxmox and Nutanix, and we cost all four before you commit.
The hypervisor decides your software cost, your backup options and the skills your team needs. We size the hardware for whichever you choose.
VMware vSphere
- ESXi bare-metal hypervisor, managed by vCenter
- vMotion live migration, DRS load balancing and HA restart
- Datastores on SAN, NFS or vSAN, which pools local drives
- Per-core subscription. At least 16 cores are counted for every processor
- Minimum order sizes have applied since 2025, and perpetual licences are no longer sold
- About USD 135 per core per year list for vSphere Foundation, and about USD 350 for Cloud Foundation
- A two-socket host of 32 cores: about USD 4,320 a year on vSphere Foundation
- Broadcom publishes no public rate card, so quotes differ
You run a large estate, or depend on tools and skills built around VMware. For a small site, we confirm current terms before recommending it.
Microsoft Hyper-V
- A role in Windows Server, with no separate hypervisor charge
- Failover clustering, live migration and SMB 3 file storage
- Storage Spaces Direct, for hyper-converged storage, needs Datacenter edition
- Windows Server per physical core: at least 8 per processor and 16 per server, plus access licences
- Standard covers two Windows guests per licensed host. Datacenter covers unlimited
- In a cluster, every host must be licensed for the virtual machines that can run on it
- Windows Server 2025 US list, one-time: Standard about USD 1,176 and Datacenter about USD 6,771 per 16-core pack
- A two-socket host of 32 cores: about USD 2,352 for Standard, or USD 13,542 for Datacenter
- Access licences are extra
Your estate is mostly Windows and you already hold Windows Server licences. Datacenter edition pays back once a host runs more than a dozen or so Windows virtual machines.
Proxmox VE
- Open-source platform that runs KVM virtual machines and LXC containers from one web console
- Clustering with HA restart and live migration
- Storage on ZFS, Ceph (built in), LVM, NFS or iSCSI
- Built-in backup, and Proxmox Backup Server for deduplicated, encrypted, incremental backups
- No per-core or per-VM fee. The software is free to use
- A paid subscription gives the stable update repository and vendor support. It does not unlock features
- Optional subscription per CPU socket per year: Community EUR 120, Basic 370, Standard 550, Premium 1,100
- A two-socket host on Standard: EUR 1,100 a year
- Proxmox Backup Server has its own subscription, per server
You want to avoid per-core licences and your team is comfortable with Linux. We plan three or more nodes for HA, and agree who provides support.
Nutanix AHV
- Nutanix Cloud Infrastructure: AOS distributed storage, the AHV hypervisor and Prism management in one stack
- Runs on standard servers, and can also use external storage
- Flow for network security, and Move to migrate virtual machines from another hypervisor
- Nutanix Unified Storage adds file, object and block services
- Software subscription, sized by node and cluster
- No public price list. Nutanix quotes by cluster, with a subscription term
- We obtain the figure for your design before you decide
You want hyper-converged infrastructure with one console and growth by adding nodes. Sizing follows the vendor’s node and compatibility lists, so we check them first.
All prices are approximate and can change at any time. Cost figures are public list prices in US dollars and euros, from late 2026, before tax, and exclude hardware, support and backup software. Indian prices depend on the channel, the agreement and the exchange rate. We quote in rupees, with the licence cost shown for each option.
We build the room too: rack, power paths and cooling.
Kirti Telnet follows the same discover, design and build stages shown above, and joins the cabling, power and cooling to the build. See Structured Cabling.
| Step | What it gives | What it needs | Typical recovery point | Typical recovery time |
|---|---|---|---|---|
| Backup to separate media | Recovery from deletion, ransomware or loss of the data | Backup software, a repository and an immutable copy | The last backup, often hours to a day | Hours to days, by data size |
| Asynchronous replication | A copy at a second site, a short delay behind | A second site and a link sized to the change rate | Minutes behind, by schedule and link | Minutes to an hour, with a restart at the second site |
| Synchronous replication | A second copy written before the write is acknowledged | A low-latency link, and storage or software that supports it | Zero or close to it | Minutes, with automated failover |
| Multi-site cluster | Both sites run workloads and each can carry the other | A low-latency link, a witness at a third location, and capacity for both sites | Zero | Virtual machines restart on the other site automatically |
Recovery point
How much recent data you can afford to lose. It decides between asynchronous and synchronous copies.
Recovery time
How long you can be down. It decides between a manual restart and automated failover.
Rehearse it
A failover that has never been tested is a guess. We test a failover and a restore at handover.
Tools by platform: vSphere HA and vSAN stretched clusters, Hyper-V Replica and failover clustering, Proxmox storage replication on ZFS, Nutanix asynchronous, NearSync and metro replication, and array replication on SAN and NAS. Figures depend on the design and the link, and we confirm each feature against the vendor’s current documentation at design.
Rack elevation
Switches at the top, servers in the middle, storage below, and heavy items as low as the rack allows. Blanking panels fill empty units so air cannot short-circuit. Weight and cable paths are planned before the rack arrives.
A rack with two DGX-class systems draws about 28 kW at maximum, which is why we settle power and cooling before the order, not after it.
ASHRAE recommends 18 to 27 °C for the air entering the servers. We plan cooling to hold that range.
We agree the tier you need, using the Uptime Institute and TIA-942 tier ideas, before sizing.
N, N+1 or 2N for power and cooling, agreed in the first phase so the budget matches the risk.
Moving ERP and databases onto new hardware, without losing a day of production.
Before the window
We take a full backup and a bootable image of every machine in scope, export the host and storage configuration, and record the current IOPS and memory ceiling, so we can show you afterwards that the new platform is faster and not merely newer.
The window itself
Migration runs in a window you set, usually a weekend or a planned shutdown. We move one workload group at a time: test and development first, then file and print, then ERP and database last.
The way back
The old hosts stay powered, licensed and cabled with their storage intact until you sign off. The rollback trigger is agreed in writing: if a workload misses its checkpoint, it goes back to the old host inside the same window.
Who owns it on Monday
Your administrators hold the hypervisor and storage credentials, the as built diagram, the RAID and firmware baseline, and a named KTPL engineer under AMC. Spare drives and a replacement controller are agreed as part of the handover.
No migration is risk free. What we commit to is a rehearsed sequence, a restore tested before we start, and a way back we have actually used.
Your enquiry: Servers, Storage and Data Centre + Data backup and disaster recovery
Questions IT heads ask us about servers, storage, GPUs and virtualisation.
VMware, Hyper-V, Proxmox or Nutanix: which should I use?
It depends on the licences you already own, the skills of your team, the backup tools you use and the budget. Hyper-V suits Windows-heavy estates. VMware suits large estates built around its tools, but is now a per-core subscription. Proxmox removes the licence fee and suits Linux-skilled teams. Nutanix suits hyper-converged designs with one console. We price each option for your workload before you choose.
How is Windows Server licensed on a new server?
By physical core. You license every core in the server, with a minimum of 8 core licences per processor and 16 per server, plus client access licences for users or devices. Standard edition covers two virtual machines on the host and Datacenter edition covers unlimited. Storage Spaces Direct needs Datacenter. In a cluster, every host must be licensed for the virtual machines that can run on it.
Which processor suits software that is licensed per core?
Usually a processor with fewer cores at a higher clock speed. Every core costs licence money, so a 192-core processor can be the expensive choice for a database or a virtualisation host that only needs 32 fast cores. We work out the licence cost for each candidate processor before we choose.
How much GPU memory does an AI model need?
As a first estimate, parameters multiplied by bytes per parameter: 2 bytes at FP16, 1 at FP8, 0.5 at FP4. A 70 billion parameter model at FP16 needs about 140 GB for weights alone. Add 20 to 30 percent for the key-value cache and activations, and more for long contexts or many simultaneous users. Training needs several times more memory than inference.
RAID 5 or RAID 6: which should I choose?
With large drives or wide arrays, RAID 6. A RAID 5 rebuild reads every other drive while no protection is left, so a second failure or a read error during it can lose data. RAID 5 can be fine for small arrays of smaller drives. RAID 10 suits databases and virtual machines that write a lot, at the cost of half the raw capacity. In every case RAID is not a backup.
What warranty and AMC do you give?
Every product we supply carries the manufacturer’s (OEM) warranty, and we can arrange extended warranty beyond it. For support afterwards we offer AMC in two forms: comprehensive, which includes spares and replacement, and non-comprehensive, which covers service and labour.
Send the requirement. We will find the route.
Share the number of users, the applications and the data you hold. You get a priced design, or a site visit first if the numbers need checking.
Get in Touch Today for Expert Solutions and Support